We achieved a lot today. Richard and Tom rebuilt the font cratch with help from Phil - it looks much better now; David B tidied up the back cabin and lit the stove to help dry things out. Rob and Kathryn cleaned and lubricated the gear change mechanism (it works better now) and then with help from Richard adjusted the idling to get the tickover to a sensible (lower) speed.
Later in the afternoon Rob continued with preparing the back cabin for painting.
Volunteer hours 31 (total 169 to date)
No comments:
Post a Comment