A mid-winter work party on a Friday to lift the shutts and sweep out the hold of Sculptor. The cloths have done a good job of keeping things so much dryer than previously although there was some condensation and one or two of the shutts looked quite damp. They will air well where they are now. The little 'holes' that go through the keelson were cleaned out as best as possible.
Volunteer hours 20 (20 to date for 2017)
No comments:
Post a Comment